Latest News

security at crashtest Posted 15.10.2017

A SEKA compressed air system (ADLA) for probably the most modern Crashtest center in the world.

In order to be able to safely carry around 900 chase tests and 1,700 sled tests, it is essential to protect the employees of the rescue team in the event of an accident.

The task was to protect the driver of the rescue vehicle against poisonous gases and vapors in the event of a fire and to provide fresh air. A conventional respiratory protection mask with compressed air supply has the disadvantage that the all-round view and the field of view of the driver are additionally impaired during a fire by the breathing air supply.

Here, we rely on the proven technology of SEKA Schutzbelüftung GmbH.

The Manitou forklift was equipped with an ADLA independent compressed air system and the cab was upgraded to a pressurized cabin. The breathing air required in the event of a fire is stored in compressed air cylinders. The ADLA is switched on if necessary and supplies the driver with fresh air without restricting the circular view or the mobility.

We wish the operator and the rescue team a safe and accident-free time.

 

Category: Projects

new brochure Posted 04.09.2017

As of now, our new SEKA catalog with detailed product information is also available for download.

If you would like to keep a printed copy in your hands, we will send you a catalog by mail.

On request, our sales representative will gladly come to you for an individual consultation according to an appointment agreement.

Category: Uncategorized

SEKA thanks the german Demolition Association Posted 01.09.2017

On 29.08.2017 the regional association NRW Ruhr under the direction of Michael Pfeiffer invited to the meeting in Oberhausen.

In the new rooms of the Zeppelin branch, a lively exchange of information took place with more than 50 participants in a relaxed atmosphere.

We also congratulate Mr Mark Köster on the election of the deputy regional leader.

Special thanks go to Mr. Andreas Tiedmann, Managing Director of the Zeppelin branch office Oberhausen and his team for the hospitality and cordial service in their new domicile.

We would like to wish all our members a lot of success.

Your
SEKA Schutzbelüftung GmbH

Category: Uncategorized

Everything in view Posted 27.02.2017

Beside protective ventilation now also rear view cameras by SEKA.

According to the standard EN474 with reference to ISO5006 is it prescribed to have a full view for construction machines.

Because of this standard, SEKA have now a return system R7-S new in the delivery program.

The infrared camera was designed extra for off-roaRückfahrkamera Web IId vehicles and construction machines.

It equates to the guide line 2003/97/EG.

The camera is in an diecasting aluminium-box and is protected against dirt and water. In addition is next to the Shutter a heating, an attractive 7”-colourdisyplay and salt water resistance cable for adverse weather.
Our skilled service staff carry the installation on site.

Interested?

Then we get excited about your call
Tel.: oo49 6341 93 41 – 0

Note:
You can find a petition for promotion at the German BG Bau.
The following link guide you to the application:
http://www.bgbau.de/praev/arbeitsschutzpraemien/kms-baumaschinen-lkw/downloads/antrag_kms-baumaschinen-lkw

Category: Products

SEKA at the DLG technician conference 2020 Posted 16.01.2020

SEKA is at the 51st conference of the DLG committee
“Experimentalism in Plant Production”
from 28.01. until 29.01. January represented in Hanover.

We are giving a lecture there on the subject of “retrofitting tractor cabins in accordance with EN 15695”.
All interested are cordially on January 29th. invited to the “Plant Protection Section” at 9:30 a.m.

We are available to all interested parties at our stand in the technology show for exchanges or questions.

More information about the event can be found at
https://ssl.dlg.org/de/landwirtschaft/veranstaltungen/dlg-technikertagung/?L=0

Category: Uncategorized

We wish you a peaceful Christmas and a successful 2020 Posted 16.12.2019

    Christmas invites us to come together,
    to take and give,
    for listening and understanding.

                       (Richard von Weizäcker)

 

Our whole team would like to before Christmas and
take advantage of the upcoming turn of the year
You for the pleasant and successful cooperation
and thank you for the trust you have placed in us.

We wish you a merry Christmas and a
successful year 2020.

your SEKA team

 

 

 

Category: Uncategorized

VDBUM and SEKA in the COREUM Posted 31.10.2019

On 29. + 30.10. In 2019 a seminar of the VDBUM took place in the Coreum of Kiesel in Stockstadt.
Topic: Digital standardization for construction machines & devices in the BIM process.
SEKA accompanied the event, which was booked up with 150 participants.

your SEKA Team

Recycling Active in Karlsruhe Posted 09.09.2019

We had many good contacts, fun and success at the Recycling Fair in Karlsruhe.

We thank our customers and the numerous interested parties who visited us at our stand.

Special thanks also to the organizing team of Messe Karlsruhe.

 

See you next time.

Your SEKA team

Category: Uncategorized

SEKA at the “Recycling Activ 2019” Posted 24.07.2019

We invite all visitors of RecyclingAKTIV & TiefbauLIVE 2019 to our stand at the trade fair tour / H605.

The RecyclingAKTIV & TiefbauLIVE 2019 will take place from 5 to 7 September 2019 at the Karlsruhe Exhibition Center.
Visitors to the demonstration fairs RecyclingAKTIV and TiefbauLIVE once again have the opportunity
to experience the latest products in the field of civil engineering and recycling plants practically in full action.

We look forward to see you!

your
SEKA-Team

Category: Uncategorized

SEKA on the “field day” of the LWK Niedersachsen Posted 11.06.2019

On 06.06.2019 the field day of the agriculture chamber Niedersachsen took place in Poppenburg near Hildesheim.
The event was opened by the welcoming words of the Niedersachsen Agriculture Minister Babara Otte-Kinast.
On 28 hectares, the numerous visitors at approx. 100 stations brought themselves up to date in the final developments of the agricultural economy.
In many interesting conversations agricultural machinery dealers as well as farmers and contractors informed themselves about the possibilities of their
To equip the vehicle cab with an SEKA protective ventilation system.
SEKA would like to thank the Chamber of Agriculture of Niedersachsen and all participants.
Category: Uncategorized

25th Demolition Conference in Berlin Posted 13.02.2019

SEKA Umwelttechnik will also be represented in Berlin for the anniversary.
We are happy to welcome many customers, friends and interested parties to our stand again this year.
We wish all participants a good journey and a successful event.

See you soon your SEKA team

Category: Uncategorized

availability SEKA Posted 15.01.2019

Due to extensive maintenance work on our telephone system,
we are today by phone and email not permanently available.

In urgent cases you can reach us under the following telephone numbers:

Sale: +49 178 934 3664

Service: +49 151 5259 1733

We ask for your understanding.

Your SEKA team

Category: Uncategorized

Generation 2.0 at SEKA Schutzbelüftung GmbH Posted 05.01.2019

Dear Sirs and Madames,

on December 10, 2018 was handover of the SEKA Schutzbelüftung GmbH
to SEKA Umwelttechnik GmbH.

The previous managing director, Mr. Lothar Müller, adopted
after all these years in well-deserved retirement.
At this point, Mr. Müller would like to thank the customers,
Suppliers and partners for the successful and enjoyable,
partly also friendly, cooperation.

From January 2019, Mr. Stefan Müller will manage the fortunes of the company.

The name of the company changes, but your contacts stay the same.
You can still reach us using the telephone numbers and e-mail addresses you know.

The new (old) team of SEKA is looking forward to another good cooperation!

Category: Uncategorized

Solution for chimney exhaust gases on a tower crane Posted 13.11.2018

The challenge was to supply the driver’s cab of a tower crane, 80m to 170m high – growing with the building, with fresh breathing air.

Here, the pivoting range of 360 ° of the tower crane was not allowed to be restricted.
In order to avoid the cost-intensive use of a compressed air system, special components and assemblies have been newly developed and manufactured by our design department as a supplement to our SBA 80 protective ventilation system.


In this solution, the pre-filtered air is sucked in at the bottom and led through a growing supply line via a patented rotary air distributor to the protective ventilation system and into the driver’s cab.

We wish the operating staff a safe and accident-free working time.
Category: Uncategorized

Proven safety through the SEKA – ADLA compressed air system Posted 16.08.2018

As part of the fleet expansion, two new wheel loaders CAT 938M were again equipped with SEKA compressed air systems for an existing customer. Through the use of breathing air systems, the construction machine operators are safely protected from the high toxic pollutant loads, as well as their field of vision is not limited by respirators.

Already in the planning of the structural design, a uniform weight distribution, the ease of maintenance and the driving characteristics of the construction machine were considered. Therefore, the load receptacles of the breathing pressure bottles were made pivotable to keep all maintenance flaps and openings freely accessible.

We would like to thank you for the trust you have placed in our technology over many years.

Pages: 1 2 3
Our website uses cookies. By continuing to browse the site, you are agreeing to our use of cookies.